Clients Requirements
The client required a link structure to accommodate a conveyor link between two buildings with a 5m level difference.
GHW Consulting Engineers Contribution
GHW designed all Civil and Structural Engineering elements for the project.
Added Value
The design was developed using 3D analysis to span the structure over an adopted drainage easement.