Client: MTC Developments Value: £7.6m Sector:

Clients Requirements

With a high specification for loadings and finishes, the client required this manufacturing building with offices to be flexible to accommodate differing future needs.

GHW Consulting Contribution

Design of the substructure and external works together with bridge foundations over the reconfigured feature lake.

Added Value

Detailed liaison with the contractor and team to value engineer the design on the project.