Client: Solihull Hospital Sector:

Client Requirements

A new steel framed Generator Housing, along with the design of a new steel framed Switch Room.

GHW Consulting Engineers Contribution

GHW were appointed directly by Solihull Hospital to provide the design of the new steel frames, substructures and below ground drainage for this project.

Added Value

Detailed design considerations were undertaken to avoid existing services, and to bridge over the existing service duct and connect to the existing building.