Clients Requirements
A domestic scheme involving the conversion of numerous barns, together with the construction of a number of new build properties and associated external works.
GHW Consulting Engineers Contribution
GHW provided all Civil and Structural Engineering design including the design of a SUDS drainage system that discharged to a stream.
Added Value
Detailed input was required in the barn conversion design to maintain stability during the conversion of the barns.